3
Shared Docs
3
Same-Page
3 / 3
Mentions
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
services may vary with required sequences of coordination. • Plus standard reimbursable expenses. • * Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services are performed in conjunction with the Pool Area w
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
t services may vary with required sequences of coordination. • Plus standard reimbursable expenses. ** Allowance, to be billed hourly ••• Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services me performed in conjunction with the Pool Area wo
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
nt services may vary with required sequences of coordination. * Plus standard reimbursable expenses. " Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage: New construction. Assumes all design services are performed in conjunction with the Pool Area
Entities connected to both Mechanical and Support and CA Services
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION