3
Shared Docs
3
Same-Page
3 / 3
Mentions
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
Entities connected to both Mechanical and Support and Communications During Construction
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION