The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
services may vary with required sequences of coordination. • Plus standard reimbursable expenses. • * Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services are performed in conjunction with the Pool Area w
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
t services may vary with required sequences of coordination. • Plus standard reimbursable expenses. ** Allowance, to be billed hourly ••• Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services me performed in conjunction with the Pool Area wo
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
nt services may vary with required sequences of coordination. * Plus standard reimbursable expenses. " Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage: New construction. Assumes all design services are performed in conjunction with the Pool Area
Entities connected to both SF Pool and CA Services
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION