The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ges in the Work; b) issue supplemental instructions related to the Work; c) confirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents requ
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ges in the Work; b) issue supplemental instructions related to the Work; c) confirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents requ
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ges in the Work; b) issue supplemental instructions related to the Work; c) confirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents requ
Entities connected to both SF Pool and 3.2.3 Submittals
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION