The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ler will recommend that Client reject it. Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate. 3.2 Communications During Construction. Client and Contractor shall communicate with each other, and with Gensler's consultants, through Gensler. Gensler will maintain logs of documents
Entities connected to both SF Pool and Communications During Construction
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor