3
Shared Docs
3
Same-Page
3 / 3
Mentions
he coast of St. Thomas. The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
e coast of St. Thomas. The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
e coast of St. Thomas. The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billing Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
Entities connected to both SF Pool Deck and Project Designer
Tom Sze
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION