3
Shared Docs
3
Same-Page
3 / 3
Mentions
nt is between Mr. Jeffrey Epstein ("Client") and M. Arthur Gensler Jr. and Associates, Inc. ("Gensler") for architectural services. A. PROJECT A.1 Project Description. The project is located on Little St. James Island, a private Island off the coast of St. Thomas. The project indudes five main areas: 1. New cons
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
nt is between Mr. Jeffrey Epstein ("Client") and M. Arthur Gensler Jr. and Associates, Inc. ("Gensler") for architectural services. A. PROJECT A.1 Project Description. The project is located on Little St. James Island, a private Island off the coast of St. Thomas. The project Includes five main areas: 1. New con
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
nt is between Mr. Jeffrey Epstein ("Client") and M. Arthur Gensler Jr. and Associates, Inc. ("Gensler") for architectural services. A. PROJECT A.1 Project Description. The project is located on Little St. James Island, a private Island off the coast of St. Thomas. The project includes five main areas: 1. New con
SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanical and Support spaces. 2. New construction of a 1,200 SF AN Garage building. 3. Exterior façade alterations and a new roof for the Main Residences. 4. New Dock H
Entities connected to both Project Description and Mechanical and Support

Joe Biden
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONTom Sze
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATION