3
Shared Docs
3
Same-Page
3 / 3
Mentions
On behalf of Andrew P. Cohen Executive Director - Santa Monica California Registration Number (Printe 09 atur LS. (Title) cc: Andrew P. Cohen, Robert Jernigan, hilla Leiserowitz, Joe Harris EFTA00605628 Gensler Little St. James Pool Area and Screening Room Agreement for Architectural Services Septembe
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
(Date) (Title) On behalf of Andrew P. Cohen Executive Director - Santa Monica Office, California Registration Number C12855 cc: Andrew P. Cohen, Robert Jernigan, filla Leiserowitz, Joe Harris /OA/ (Date) EFTA00724814 Gensler Little St. James Pool Area and Screening Room Agreement for Architectural Servi
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
(Title) (Date) On behalf of Andrew P. Cohen Executive Director - Santa Monica Office, California Registration Number C12855 cc: Andrew P. Cohen, Robert Jernigan, NIla Leiserowitz, Joe Harris EFTA00727153 Gensler Little St. James Pool Area and Screening Room Agreement for Architectural Services September
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Entities connected to both Robert Jernigan and Geotechnical Engineering
Bob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION