ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman, AIA fel& Dv AtmAin (Signature) Principal, it 91° 47 (Title) (Date) On behalf of Andrew P. Cohen Executive Director - Santa Monica Califor
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman. AIA fel& Dv entmAm. (Signature) Principal. (Title) (Printe /I9•01 Ls, atur (Date) (Title) On behalf of Andrew P. Cohen Executive Direct
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
ted to provide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler Warwick Ian Wicksman, AIA By Client (Printed Name of Signatory) By B (Signature) (Signature) principal (Title) (Date) (Title) (Date) On behalf of Andrew P. Coh
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Entities connected to both Warwick Ian Wicksman and Geotechnical Engineering
Bob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION