3
Shared Docs
3
Same-Page
3 / 3
Mentions
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman, AIA fel& Dv AtmAin (Signature) Principal, it 91° 47 (Title) (Date) On behalf of Andrew P. Cohen Executive Director - Santa Monica Califor
The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman. AIA fel& Dv entmAm. (Signature) Principal. (Title) (Printe /I9•01 Ls, atur (Date) (Title) On behalf of Andrew P. Cohen Executive Direct
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
ted to provide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler Warwick Ian Wicksman, AIA By Client (Printed Name of Signatory) By B (Signature) (Signature) principal (Title) (Date) (Title) (Date) On behalf of Andrew P. Coh
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
Entities connected to both Warwick Ian Wicksman and SF Pool
Bob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION