4
Shared Docs
4
Same-Page
4 / 4
Mentions
id the corals and what measures will be taken during the cable lay to prevent impact to these species. BI0IMPACT, INC. Page 3 EFTA00582901 6.10 Air Quality: The impact on air quality during the cable lay will be discussed 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land and Water
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
step taken to avoid the corals and what measures will be taken during the dock construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
Entities connected to both Air Quality and The Lump Sum Cost of
Landforms, Geology, Soils
ORGANIZATIONUtilities
ORGANIZATIONTerrestrial Resources
ORGANIZATIONVIWAPA
ORGANIZATIONHistoric Land
LOCATION
Jeffrey Epstein
PERSON
San Juan
LOCATIONthe Coastal Zone
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONMycetophylla
PERSON
Sarah Ferguson
PERSONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATION