4
Shared Docs
4
Same-Page
4 / 4
Mentions
id the corals and what measures will be taken during the cable lay to prevent impact to these species. BI0IMPACT, INC. Page 3 EFTA00582901 6.10 Air Quality: The impact on air quality during the cable lay will be discussed 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land and Water
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
step taken to avoid the corals and what measures will be taken during the dock construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
Entities connected to both Air Quality and Public Hearings
Landforms, Geology, Soils
ORGANIZATIONUtilities
ORGANIZATIONTerrestrial Resources
ORGANIZATIONVIWAPA
ORGANIZATIONHistoric Land
LOCATION
Jeffrey Epstein
PERSON
San Juan
LOCATIONthe Coastal Zone
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONMycetophylla
PERSON
Sarah Ferguson
PERSONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATION