4
Shared Docs
4
Same-Page
4 / 4
Mentions
ely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation. 6.08 Wetlands: Bioimpact, Inc.
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the route can be laid out to avoid endangered species this may not be necessary. All information should be contained
ely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation and dock access. 6.08 Wetlands:
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
INC. Page 4 EFTA00583582 within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NN1FS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation and dock access. 6.08 Wetlands:
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
ely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation and dock access. 6.08 Wetlands:
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Entities connected to both Terrestrial Resources and Formal Section 7 Consultation
Utilities
ORGANIZATIONAir Quality
ORGANIZATIONHistoric Land
LOCATIONVIWAPA
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONErika Kellerhals
PERSON
San Juan
LOCATIONthe Coastal Zone
LOCATIONPublic Hearings
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONCable Lay Monitoring
ORGANIZATION
Sarah Ferguson
PERSONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATION