4
Shared Docs
4
Same-Page
4 / 4
Mentions
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the cable landing, path and the i
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the cable lay. I will verify with David Brewer of VISHPO if one will be required and if not I will get a l
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock and the cable lay. I can ask David Brewer of VISHPO if one will be required and
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
ruction procedures. If either NMFS or FWS determine that the project may impact endangered species Formal Section 7 consultation will be required. Archeological surveys may be required for the extension of the dock and the new dock structure, the cable should not require an archeological study since it will
Entities connected to both Landforms, Geology, Soils and Archeological
Utilities
ORGANIZATIONAir Quality
ORGANIZATIONHistoric Land
LOCATIONVIWAPA
ORGANIZATIONTerrestrial Resources
ORGANIZATIONthe Coastal Zone
LOCATION
San Juan
LOCATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONCable Lay Monitoring
ORGANIZATION
Sarah Ferguson
PERSONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATION