Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the cable landing, path and the i
uired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
importance to avoid reefs to reduce the potential of having to engage in formal BIOIMPACT, INC. Page 2 EFTA00583317 Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Wate
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
ired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
quired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federa
Entities connected to both Landforms, Geology, Soils and the Federal Agencies
Utilities
ORGANIZATIONVIWAPA
ORGANIZATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATIONthe Coastal Zone
LOCATIONErika Kellerhals
PERSON
San Juan
LOCATIONCable Lay Monitoring
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONMycetophylla
PERSON
Sarah Ferguson
PERSONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service