4
Shared Docs
4
Same-Page
4 / 4
Mentions
we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the cable landing, path and the impact of the projec
y well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the project on the geo
e able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the project on the geo
to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the project on the geo
o engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
Entities connected to both Historic Land and U.S. Army Corps
Utilities
ORGANIZATIONAir Quality
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONVIWAPA
ORGANIZATIONTerrestrial Resources
ORGANIZATIONthe Coastal Zone
LOCATION
San Juan
LOCATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONCable Lay Monitoring
ORGANIZATION
Sarah Ferguson
PERSONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATION