3
Shared Docs
3
Same-Page
3 / 3
Mentions
g floor tile- = coral stone) and place in dumpster, 496 sf TOTAL $ 1,240 =br> dray pack-level entire floor 496 sf, TOTAL $ 1,240 install 496 sf of Carrera barbel tile 18x18 or 12x12 =n a straight pattern TOTAL $ 3,7201 Q 4> STAF COTAGE remove all existing floor tile- in the porche, a=d place in dump
e= Tile. Replacement We can get 24x24 tile as well=for less than $6 a square foot material only Russell Hernandez Begin for=arded message: From: Mark Libonati Date: February 23, 2018 at 7:36:52 PM EST To: Russell Subject: Fwd: I.s.j=tile job =blockquote type="cite"> Tile demo and install proposal. Sen
=sting floor tile- ( coral stone) and place in dumpster, 496 sf TOTAL $=1,240 dray pack-level entire floor 496 sf, TOTAL 5=1,240 install 496 sf of Carrera barbel tile 1=x18 or 12x12 on a straight pattern TOTAL $ 3,7201 =nbsp; = STAF COTAGE =div id="m_9212437426419872272gmail-m_666623224357417352gma
placement We can get 24x24 tile as well for less than $6 a s=uare foot material only Russell Hernandez Begin forwarded message: </=iv> From:=/b> Mark Libonati <mailto Date: Februa 23,=2018 at 7:36:52 PM EST To: Russell <mailto >=/div> Subject: Fwd: I.s.j tile job Tile demo and install proposal= EFT
floor tile- ( coral stone) and pla=e in dumpster, 496 sf TOTAL $ 1,240 dray pac=-level entire floor 496 sf, TOTAL $ 1,240 install&=bsp; 496 sf of Carrera barbel tile 18x18 or 12x12 on a straight pattern TOT=L $ 3,7201 &nbs=; &nb=p; STAF COTAGE <=iv class="m_-3758335389530146644m_921243742641987227
=tile as well for less than $6 a square foot material only <=r> EFTA_R1_01658534 EFTA02521362 Russell Hernan=ez Begin forwarded message: From: Mark Libonati <mailto <mailto Date: Februa 23 2018 at 7:36:52 P= EST To: Russell Su=ject: Fwd: I.s.j tile job =div dir="auto"> Tile demo and install propos
Entities connected to both Carrera and Mark Libonati