4
Shared Docs
4
Same-Page
4 / 4
Mentions
long work lime. 12. Leact.Timos given are based On nformaton received by suppler, and manufacturers aid are subleCI to change at any time. therefore Dulles Glass and Mirror shall not be held responsible 10r delays caused by suppliers and manufacturers. 13. II Contractor asserts nonpayment due t0 nonLiairment
gineering. Permits. Bonds. Ownolioon. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Core Drilling for Floor Closures. My Electical Work. unless noted in the scope ol work. 16. Orders totaling up to $500.00 require to be pad in al at the lime of order. Invoice will be provided upon re
long work lime. 12. Leact.Timos given are based On nformaton received by suppler, and manufacturers aid are subleCI to change at any time. therefore Dulles Glass and Mirror shall not be held responsible 10r delays caused by suppliers and manufacturers. 13. II Contractor asserts nonpayment due t0 nonLiairment
gineering. Permits. Bonds. Ownolioon. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Core Drilling for Floor Closures. My Electical Work. unless noted in the scope ol work. 16. Orders totaling up to $500.00 require to be pad in al at the lime of order. Invoice will be provided upon re
:Cite change at any time. therelore OGIA shall not be held responsible for delays. 13. Y Contractor asserts nonpayment Ste to nonpayment then Owner, Dulles Glass and Mirror reserves the right to contact said Owner regarding the status of payments on the Project. 14.0n sip tor Field Measurement for 0610 provid
ngineering. Permits. Bonds. Ownolioon. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Care Drilling to Floor Closures. My Electical Work. unless noted in the scope ol work. 16. Cyders totaling up to $500.00 require to be pad in al at the lime of order. Invoice will be provided upon re
long work lime. 12. Leact.Timos given are based On nformaton received by suppler, and manufacturers aid are subleCI to change at any time. therefore Dulles Glass and Mirror shall not be held responsible 10r delays caused by suppliers and manufacturers. 13. II Contractor asserts nonpayment due t0 nonLiairment
gineering. Permits. Bonds. Ownolioon. Temporary Enclosures. Repairs or Modification of Existing Opening or Frames. Core Drilling for Floor Closures. My Electical Work. unless noted in the scope ol work. 16. Orders totaling up to $500.00 require to be pad in al at the lime of order. Invoice will be provided upon re
Entities connected to both Dulles Glass and My Electical Work
Manassas
LOCATION
Glass
PERSONBrice-Little
PERSON
Saint James
LOCATIONTemporary Enclosures
ORGANIZATIONAcrylic Mirror
ORGANIZATIONDULLES GLASS & MIRROR
ORGANIZATION
FedEx
ORGANIZATIONField Measurement
ORGANIZATIONSilver Spring
LOCATIONSt P.O.
LOCATIONGuiles Glass
PERSONHerne
PERSONMco..Fn
ORGANIZATIONWended
ORGANIZATIONDoles Oats
ORGANIZATIONMD Showroom
PERSONDulles Glass d Miner
ORGANIZATIONVanSPOrlatOn
ORGANIZATIONMirror °
ORGANIZATION