ubjecl to change at any line. therefore OW shall not be held responsible la delays. 13.0 Contractor asserts nonpayment due to nonpayment from Owner. Dulles Glass and Mirror reserves the right to contact said Owner raga/ding the status a payments on tie Project 14.0ne tip for Field Measurement foe DAM provided
Repairs or Modilicztion of Existing Opening or Frames. Con Drilling tor Floor Closures. Any Electrical Work, uNOSS noted in the scope 01 work. 16. Ceders totaling up to $500.00 require to be paid in lul at the bile el order. Invoicewill be provided upon request. 17. Removal a °cane materials may damag
ong work OMB. 12. Leed.Tirnes given are based on intomiaten received by suppliers and manufacturers and are subject to change at any line. therefore Dulles Glass and Mirror shall not be held respansble lot delays caused by suppliers and manufacturers. 13. It Contractor asserts nonpannem due to nonpayment Wan
Repairs or Modification of Existing Opening or Frames. Core Drilling Ice Floor Closures. Any Electrical Work. uNess noted in the scope 01 work. IS. Ceders totaling up to 1500.00 require to be pad in full al the time of order. Invoice will be provided upon request. 17. Removal or 'Mang manors may damage
:Cite change at any time. therelore OGIA shall not be held responsible for delays. 13. Y Contractor asserts nonpayment Ste to nonpayment then Owner, Dulles Glass and Mirror reserves the right to contact said Owner regarding the status of payments on the Project. 14.0n sip tor Field Measurement for 0610 provid
res. Repairs or Mocaticatam Existing Opening or Frames. Core Drilling lc Floor Closures. Any Electrical Week. unless noted in the soap* ol weft 18. Ceders totaling up to $500.00 require to be pad in MI at the time ol order. Invoice will be provided upon request. 17. Removal of °Sang materials may damag
ect to change at any line. therefore DGM shall not be held responsible la delays. 13.0 Contractor asserts nonpayment due to nonpayment Ironer Owner. Dulles Glass and Mirror reserves the rigout° contact said Owner regarding tie status of payments on me Prom. 14.0ne tip for Field Measurement la DAM provided ins
s. Repairs or Modiacztion of Existing Opening or Frames. Core Gritting la Floor Closures. Any Electrical Wart uNess noted in the scope of work. 16. Ceders totaling up to $500.00 require to be paid in ful at the blue of order. Invoice will be provided upon request. 17. Removal of °nand materials may dam
:Cite change at any time. therelore OGIA shall not be held responsible for delays. 13. Y Contractor asserts nonpayment Ste to nonpayment then Owner, Dulles Glass and Mirror reserves the right to contact said Owner regarding the status of payments on the Project. 14.0n sip tor Field Measurement for 0610 provid
res. Repairs or Mocaticatam Existing Opening or Frames. Core Drilling lc Floor Closures. Any Electrical Week. unless noted in the soap* ol weft 18. Ceders totaling up to $500.00 require to be pad in MI at the time ol order. Invoice will be provided upon request. 17. Removal of °Sang materials may damag
:Cite change at any time. therelore OGIA shall not be held responsible for delays. 13. Y Contractor asserts nonpayment Ste to nonpayment then Owner, Dulles Glass and Mirror reserves the right to contact said Owner regarding the status of payments on the Project. 14.0n sip tor Field Measurement for 0610 provid
res. Repairs or Mocaticatam Existing Opening or Frames. Core Drilling lc Floor Closures. Any Electrical Week. unless noted in the soap* ol weft 18. Ceders totaling up to $500.00 require to be pad in MI at the time ol order. Invoice will be provided upon request. 17. Removal of °Sang materials may damag
terial listed may cause a change in pricing and sill be SUIeleCt 10 a sexton Change Order 11. Signed Change Orders mist be received and approved by Dulles Glass and tarror and Contractor poor to any additional work being performed and a is understood that the Change Order may increase material delworY times
, Repairs Or Modification Of Existing Opening or Frames. Core Drilling for Floor Closures. Any Electrical Week. udess noted in the scope of was. 18 Ceders towing up 10 $.500 CO require to be pad in luii at the Inc of order Invoice will be provided upon request 17. Removal of eutang materials may damage
ong work OMB. 12. Leed.Tirnes given are based on intomiaten received by suppliers and manufacturers and are subject to change at any line. therefore Dulles Glass and Mirror shall not be held respansble lot delays caused by suppliers and manufacturers. 13. It Contractor asserts nonpannem due to nonpayment Wan
Repairs or Modification of Existing Opening or Frames. Core Drilling Ice Floor Closures. Any Electrical Work. uNess noted in the scope 01 work. IS. Ceders totaling up to 1500.00 require to be pad in full al the time of order. Invoice will be provided upon request. 17. Removal or 'Mang manors may damage
Entities connected to both Dulles Glass and Ceders
Manassas
LOCATION
Mirror
ORGANIZATION
Glass
PERSON
Condoleezza Rice
PERSONBrice-Little
PERSONDULLES GLASS & MIRROR
ORGANIZATIONTemporary Enclosures
ORGANIZATION
Saint James
LOCATIONAcrylic Mirror
ORGANIZATIONSilver Spring
LOCATIONTirnes
ORGANIZATIONField Measurement
ORGANIZATIONINNO ATION
ORGANIZATION
Jeffrey Epstein
PERSONMirror Mastic
ORGANIZATIONPALM BEACH SEAPORT
LOCATIONMD Showroom
PERSONlabricabon.dethery
ORGANIZATIONColes Oats
ORGANIZATIONY Contractor