4
Shared Docs
4
Same-Page
5 / 4
Mentions
ate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Page 6 of 18 EFTA00
an e wo Mockup built (Measurments still in question) In-progress. On hold until JE advise. See #49 See #49 Build Dock Box with Bench similar to Yacht interior orking on this. Should have better idea 5/31 of completion Excelled on June 6. 2019 6:07:52 AM BOT Page 5 01 18 EFTA00258969 57 Chri
C 134 LSJ Suburban Mi lz& Cliffs Auto cpa rs Accident Remove damaged sail boat Remove boat debris Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24 Production lead time is 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Metcalf: Blanket install on the exhaust
f the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida IMM0 WO ANDS C)
LSJ Suburban Carlos & Cliffs Auto Repairs Accident Evened on June 9.2019 9.33.34 PM 80T DasaIption Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24. Production lead time is 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 Metc
56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18 EFTA00259144 I
162 137 JE Denali & Caribbean Auto Man A/C 138 LSJ Suburban ALto epairs Accident Description Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24. Production lead time s 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 Metca
li Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5 or 18 SDNY_GM_00
arlos & Caribbean Auto Mart aC 138 LSJ Suburban Carlos & Cliffs Auto Repairs Accident DeBenetton Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc. 5/24. Production lead time is 10 weeks. EDA to production completion 8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 Metc
Entities connected to both Yacht and Blue Ocean Tackle Inc.

Jeffrey Epstein
PERSONLeon Black
PERSONAllied
ORGANIZATION
Julie K. Brown
PERSON
Marc Rich
PERSON
Palm Beach
LOCATION
Oliver Stone
PERSON
Richard Kahn
PERSON
Samantha Power
PERSON
Prince Charles
PERSON
Joi Ito
PERSONFranks Electric
ORGANIZATIONMB Bath
ORGANIZATIONFlanders
LOCATIONHelipad Office
ORGANIZATIONTwin Bedroom
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATIONNautica
ORGANIZATIONMuffler Rubber mount
LOCATIONIsland Wide
LOCATION