4
Shared Docs
4
Same-Page
5 / 4
Mentions
ate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Page 6 of 18 EFTA00
an e wo Mockup built (Measurments still in question) In-progress. On hold until JE advise. See #49 See #49 Build Dock Box with Bench similar to Yacht interior orking on this. Should have better idea 5/31 of completion Excelled on June 6. 2019 6:07:52 AM BOT Page 5 01 18 EFTA00258969 57 Chri
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
f the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida IMM0 WO ANDS C)
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18 EFTA00259144 I
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
li Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5 or 18 SDNY_GM_00
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Yacht and Tropical Shipping STT

Jeffrey Epstein
PERSONLeon Black
PERSONAllied
ORGANIZATION
Julie K. Brown
PERSON
Marc Rich
PERSON
Palm Beach
LOCATION
Oliver Stone
PERSON
Richard Kahn
PERSON
Samantha Power
PERSON
Prince Charles
PERSON
Joi Ito
PERSONFranks Electric
ORGANIZATIONMB Bath
ORGANIZATIONFlanders
LOCATIONHelipad Office
ORGANIZATIONTwin Bedroom
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATIONNautica
ORGANIZATIONMuffler Rubber mount
LOCATIONIsland Wide
LOCATION