ate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Page 6 of 18 EFTA00
an e wo Mockup built (Measurments still in question) In-progress. On hold until JE advise. See #49 See #49 Build Dock Box with Bench similar to Yacht interior orking on this. Should have better idea 5/31 of completion Excelled on June 6. 2019 6:07:52 AM BOT Page 5 01 18 EFTA00258969 57 Chri
gOSSMIY7 VIP Priorities: • MC Gazebos sylvester • MC Service gates w/10ft Colums (_plus carpenter) Ir s • All service gates. New wood needed (Tunnel, Engineering & Heli) • roads Tr? Za • Five palms bid & Franks electric? • Flagpole bid? —"‘ • t o • Engineering doors g, • Steel buildings , • Sables swithces
f the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida IMM0 WO ANDS C)
FTA01309493 VIP Priorities: • MC Gazebos sylvester • MC Service gates w/10ft Colums (danny plus carpenter) • All service gates. New wood needed (Tunnel, Engineering & Heli) • Jeffers roads • Five palms bid & Franks electric? • Flagpole bid? • Engineering doors . • Steel buildings , • Paul Gandy cables swithces tre
56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18 EFTA00259144 I
M COTTAGE EFTA00259137 VIP Priorities: • MC Gazebos • MC Service gates w/10ft Colums (M plus carpenter) • All service gates. New wood needed (Tunnel, Engineering & Heli) • roads • Five palms bid & Franks electric? • Flagpole bid? • Engineering doors . • Steel buildings , • cables swithces trench bid • ro tre
li Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5 or 18 SDNY_GM_00
5507/7/7 VIP Priorities: • MC Gazebos sylvester • MC Service gates w/10ft Colums (danny plus carpenter) it • All service gates. New wood needed (Tunnel, Engineering & Heli) • Jeffers roads — D am— • Five palms bid & Franks electric? .., • Flagpole bid? • Engineering doors P.0 • Steel buildings , • Paul Gandy cabl
Entities connected to both Yacht and Tunnel, Engineering & Heli

Jeffrey Epstein
PERSONLeon Black
PERSONAllied
ORGANIZATION
Julie K. Brown
PERSON
Marc Rich
PERSON
Palm Beach
LOCATION
Oliver Stone
PERSON
Richard Kahn
PERSON
Samantha Power
PERSON
Prince Charles
PERSON
Joi Ito
PERSONChristmas Cove Service Dock
ORGANIZATIONFranks Electric
ORGANIZATIONFlanders
LOCATIONMB Bath
ORGANIZATIONHelipad Office
ORGANIZATIONTwin Bedroom
ORGANIZATIONNautica
ORGANIZATIONMuffler Rubber mount
LOCATIONIsland Wide
LOCATION