4
Shared Docs
4
Same-Page
5 / 4
Mentions
ate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Page 6 of 18 EFTA00
an e wo Mockup built (Measurments still in question) In-progress. On hold until JE advise. See #49 See #49 Build Dock Box with Bench similar to Yacht interior orking on this. Should have better idea 5/31 of completion Excelled on June 6. 2019 6:07:52 AM BOT Page 5 01 18 EFTA00258969 57 Chri
gOSSMIY7 VIP Priorities: • MC Gazebos sylvester • MC Service gates w/10ft Colums (_plus carpenter) Ir s • All service gates. New wood needed (Tunnel, Engineering & Heli) • roads Tr? Za • Five palms bid & Franks electric? • Fl
f the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida IMM0 WO ANDS C)
TTAGE 30 HOLIDAY CONFIDENTIAL SDNY_GM_00332793 EFTA_002055 19 EFTA01309493 VIP Priorities: • MC Gazebos sylvester • MC Service gates w/10ft Colums (danny plus carpenter) • All service gates. New wood needed (Tunnel, Engineering & Heli) • Jeffers roads • Five palms bid & Franks electric? • Fl
56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18 EFTA00259144 I
DUSTING VACUUM ALL COTTAGE 29 FRIDAY CLEAN DUSTING AND VACCUM COTTAGE EFTA00259137 VIP Priorities: • MC Gazebos • MC Service gates w/10ft Colums (M plus carpenter) • All service gates. New wood needed (Tunnel, Engineering & Heli) • roads • Five palms bid & Franks electric? • Flagpole bid
li Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5 or 18 SDNY_GM_00
MO 5507/7/7 VIP Priorities: • MC Gazebos sylvester • MC Service gates w/10ft Colums (danny plus carpenter) it • All service gates. New wood needed (Tunnel, Engineering & Heli) • Jeffers roads — D am— • Five palms bid & Franks ele
Entities connected to both Yacht and Colums

Jeffrey Epstein
PERSONLeon Black
PERSONAllied
ORGANIZATION
Julie K. Brown
PERSON
Palm Beach
LOCATION
Marc Rich
PERSON
Oliver Stone
PERSON
Richard Kahn
PERSON
Joi Ito
PERSON
Prince Charles
PERSON
Samantha Power
PERSONNC Unit
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATIONTropical Shipping STT
ORGANIZATIONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATIONLighting & Electrical
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATIONClutch
ORGANIZATIONTrenching Area & Description
ORGANIZATION