4
Shared Docs
4
Same-Page
5 / 4
Mentions
ate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Page 6 of 18 EFTA00
an e wo Mockup built (Measurments still in question) In-progress. On hold until JE advise. See #49 See #49 Build Dock Box with Bench similar to Yacht interior orking on this. Should have better idea 5/31 of completion Excelled on June 6. 2019 6:07:52 AM BOT Page 5 01 18 EFTA00258969 57 Chri
weather. Per 5 " I'm sorry, I don't have an answer as yet" He waiting on ..ontractor to give him answers on the hydraulic. e wi i con inue o call Barge arrival home could be between June 10th-15th Take Nana to Offshore to get tie Engines Checked Nautica delivered 5/18/19. Fiberglass modifications
f the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida IMM0 WO ANDS C)
ry, I don't have an answer as yet" He's waiting on Bobby & Boddy's Contractor to give him answers on the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 10th-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/18/19. Fiberglass modifications
56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18 EFTA00259144 I
r. Per 6/5 " sorry, I don't have an answer as yet" He's waiting on Contractor to give him answers on the hydraulic. e wr will con inue to call Barge anival home could be between June 10th-15th Take. to Offshore to get the Engines Checked Nautica delivered 918/19. Fiberglass modifications in pr
li Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5 or 18 SDNY_GM_00
ry, I don't have an answer as yet* He's waiting on Bobby & Boddy's Contractor to give him answers on the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 100-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/16/19. Fiberglass modifications i
Entities connected to both Yacht and Barge

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONDaphne Wallace
PERSON
Carlos
PERSON
Condoleezza Rice
PERSON
Oliver Stone
PERSON
Puerto Rico
LOCATIONLeon Black
PERSON
Alfredo Rodriguez
PERSON
Samantha Power
PERSONDarren Indyke
PERSON
Ghislaine Maxwell
PERSONKaren
PERSON
Prince Charles
PERSON
Cabana
LOCATION
Julie K. Brown
PERSONAllied
ORGANIZATIONCecile de Jongh
PERSON
George W. Bush
PERSON