Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do no
Entities connected to both Substantial Completion and Submittal

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONConstruction Administration
ORGANIZATIONProject Architect
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONthe Schematic Design
ORGANIZATIONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONArchitectural Services
ORGANIZATIONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONProject Description
ORGANIZATIONSF Pool Deck
ORGANIZATIONSF Pool
ORGANIZATIONSF Cabana
ORGANIZATIONSF Pavilions
ORGANIZATION