Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
Entities connected to both Substantial Completion and Fire Alarm

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONthe Schematic Design
ORGANIZATIONConstruction Administration
ORGANIZATIONProject Architect
ORGANIZATIONStructural Engineering
ORGANIZATIONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONCivil Engineering
ORGANIZATIONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATIONSF Pool Deck
ORGANIZATIONSF Pool
ORGANIZATIONSF Cabana
ORGANIZATIONSF Pavilions
ORGANIZATION