ion in accordance with the Contract Documents. § 3.4.6 PROJECT COMPLETION The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date of final completion; issue Certificates of Substantial Completion; receive from the Contractor and forward to the Owner, for the Owner
CIAL TERMS AND CONDITIONS Special terms and conditions that modify this Agreement are as follows: 12.1 All Consultant Fees (Structural Engineering, Civil Engineering, Energy Analysis, Etc.) shall be in addition to Basic Compensation and will be billed to the Owner as a Reimbursable Expense outlined in paragraph 1
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
t, and shall be provided by Client, Client's consultants, or others: a) Consulting services other than those included in Gensler's scope above. b) Civil Engineering, including shoring, excavation, grading, drainage, on-site and off-site utilities, septic systems, exterior pavement and curbs for parking, drives,
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
t, and shall be provided by Client, Client's consultants, or others: a) Consulting services other than those included in Gensler's scope above. b) Civil Engineering, including shoring, excavation, grading, drainage, on-site and off-site utilities, septic systems, exterior pavement and curbs for parking, drives,
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
t, and shall be provided by Client, Client's consultants, or others: a) Consulting services other than those included in Gensler's scope above. b) Civil Engineering, including shoring, excavation, grading, drainage, on-site and off-site utilities, septic systems, exterior pavement and curbs for parking, drives,
Entities connected to both Substantial Completion and Civil Engineering

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONProduct Data
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONthe Schematic Design
ORGANIZATIONConstruction Administration
ORGANIZATIONProject Architect
ORGANIZATIONStandard Terms and Conditions
ORGANIZATION
Prince Andrew
PERSON
Michael Cohen
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATIONSF Pool Deck
ORGANIZATIONSF Pool
ORGANIZATIONSF Cabana
ORGANIZATIONSF Pavilions
ORGANIZATION