ion in accordance with the Contract Documents. § 3.4.6 PROJECT COMPLETION The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date of final completion; issue Certificates of Substantial Completion; receive from the Contractor and forward to the Owner, for the Owner
times. ARTICLE 12 SPECIAL TERMS AND CONDITIONS Special terms and conditions that modify this Agreement are as follows: 12.1 All Consultant Fees (Structural Engineering, Civil Engineering, Energy Analysis, Etc.) shall be in addition to Basic Compensation and will be billed to the Owner as a Reimbursable Expense outl
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
Entities connected to both Substantial Completion and Structural Engineering

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONCivil Engineering
ORGANIZATIONProduct Data
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONProject Architect
ORGANIZATIONConstruction Administration
ORGANIZATIONthe Schematic Design
ORGANIZATIONBasic and Additional Services
ORGANIZATIONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATIONSF Pool Deck
ORGANIZATIONSF Pool
ORGANIZATION