8
Shared Docs
8
Same-Page
8 / 8
Mentions
len, Tail (GIV plane) 2:30pm Arrive NY, Teterboro, Atlantic Aviation Thurs. Jan. 2.2014 NY-PB Reminder Darren back in the office today Reminder: Rich Barnett back in the office today 8:00am Appt for CT Scans and Ultrasounds at East River Imaging 519 East 72nd St, Suite 103 (between York and the river) T
in Nowak Wed. Jan. 29. 2014 Reminder Dr Bard in an. 29-Feb 1 home) 11:00am Phone Date w/Vinit and Tazia (they will call us) 1:00pm Phone Date w/John Woods (==j) 1:30pm Appt w/Harry Beller (M=) 3:00pm Phone Date w/Joe Thakuria 7:30pm Phone Date w/Nicole Junkermann Thurs. Jan. 30.2014 NY 12:00pm 1:0
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym NOLpgallatial - installation of the speed bag - David (car
ar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU di
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. Equipme
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal
oncrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 17. New Employee Bat
ar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & inst
r drains thru surface, used on St John & St Thomas - Contact Tom Melnick about concrete road construction 11/5 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 17. New Employee Bat
ar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & inst
oncrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 17. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 18. New Employee Bat
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equ
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym New punching bag — installation of the speed bag - David (
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. - (3)
Entities connected to both Richard Barnett and John P. Woods

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Lesley Groff
PERSON
Richard Kahn
PERSONDarren Indyke
PERSONLeon Black
PERSONDaphne Wallace
PERSONJanusz Banasiak
PERSON
Woody Allen
PERSON
Karyna Shuliak
PERSONLarry Visoski
PERSONCecile de Jongh
PERSON
Condoleezza Rice
PERSON
Ehud Barak
PERSON
Bella Klein
PERSON
John F. Kennedy
PERSON
Boris Nikolic
PERSONErika Kellerhals
PERSON
Bobby Slayton
PERSON
George Mitchell
PERSON