3
Shared Docs
3
Same-Page
3 / 3
Mentions
400 pieces of bu=lnose tile, full container, $18,725.00, not including shipping how do wish to proceed =E200regards =div dir="ltr"> Bri=e Gordon The Saint James Group =SVI please note The information contained in this communication is confidential, =ay be attorney-client privileged, may constitute inside infor
From: brice gordon Sent: Monday, July 23, 2018 4:29 PM To: Jeffrey E. Cc: Rich Kahn; LS1 GS1 Subject: Re: LSJ Coral Stone wit= forward request to Luis On Mon, Jul 23, 2018 at 9:29 AM, jeffrey E. <[email protected] <mailto:[email protected]» wrote: wrote: need
[email protected]> , and destro= this communication and all copies thereof, including all attachments. =opyright -all rights reserved Brice Gordon The Saint James Group USVI 2 EFTA_R1_01787990 EFTA02600772
om» wrot=: road builindg/ =orro gyn doors.? roof tiles? On Mon, Jul 23, 2=18 at 4:34 PM, brice gordon wro=e: Good Morni=g Attached Estimates for=Coral Stone from the DR Also E mail outlining Rebar and Steel Cost from DR. The Ship is not licensed forrUS waters, but they would be prepared to do so, if the
[email protected]> , and > destroy this communication and all copies thereof, > including all attachments. copyright -all rights reserved Brice Gordon The Saint James Group USVI Ph please note The information co=tained in this communication is confidential, may be attorney-client pr=vileged, may constitute inside
d to remove Partition Wall that separa=es the existing Kitchen and Storage Room Relocate Electrical Panel which is located in Pa=tition Wall Re=ove Coral Stone floor from Storage Room and lay marble to match existing k=tchen floor, or remove both and install new floor? Changes to kitchen design Delay inst
Entities connected to both The St. James Group and Coral Stone

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSONKaren
PERSONBrice Gordon
PERSON
Marc Rich
PERSONDaphne Wallace
PERSON
Oliver Stone
PERSONRebar and Steel Cost
ORGANIZATION