9
Shared Docs
9
Same-Page
15 / 9
Mentions
ior to the acquisition of Great St. James Island. The morrings were not installed by Great St Jim, LLC nor have they been nor are they maintained by Great St. Jim, LLC. The moorings are affixed to submerged land which is not part of Great St. James Island and not owned by Great St Jim, LLC. Although Great St.
ion I, Paragraphs 7A and 7C, respectively, of the Notice to Cure. Photographs of the completed work are attached for your reference. As you can see, Great St. Jim, LLC is doing everything it can to comply as quickly as possible with DPNR's directives in the Notice to Cure. In continuing work with regard to the
eat St Jim, LLC seeks clarification as to what specifically DPNR claims to be the violation involved in the item described in Paragraph 7B. Although Great St. Jim, LLC disagrees that the retaining wall constitutes a violation, we will be happy to remove it after receiving clarification as to what cure DPNR req
fercom November 17, 2016 Via Electronic Mail Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2fid Floor St. Thomas. VI 00802 Re: Notice to Cure & NOVA-04-16-STT Dear Attorney Baker: I wanted to let you know that Great
e Settlement Agreement. These moorings were in place prior to Great St. Jim, LLC's acquisition of Great St. James Island. They were not installed by Great St. Jim, LLC nor have they been nor are they maintained by Great St. Jim, LLC. The moorings are affixed to submerged land which is not part of Great St. Ja
covering identified in Paragraphs 7A and C would have substantially mitigated any potential for soil erosion, blow off or runoff. In addition, had Great St. Jim, LLC elected to mitigate the potential for soil erosion, blow off and runoff at the site identified in Paragraph 7A by covering the area with a larg
§910(a)(1) is prime example of why further discussion and clarification is required before Great St Jim, LLC takes further action and DPNR declares Great St. Jim, LLC in default under the Settlement Agreement. These moorings were in place prior to Great St. Jim, LLC's acquisition of Great St. James Island. Th
17, 2016 Via Hand Delivery & Electronic Mail Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI 00802 [email protected] Re: Notice to Cure & NOVA-04-16-STT Dear Attorney Baker: I wanted t
rt Terminal Building 2nd Floor St. Thomas, VI 00802 Dawn.FienOtiparrigor Re: Great St. James Sargassum Issue Dear Attorney Henry: On behalf of Great St. Jim, LLC, we are requesting permission from your agency to utilize a mini excavator and trackhoe to remove significant amounts of sargassum which have b
rmission from your agency to utilize a mini excavator and trackhoe to remove significant amounts of sargassum which have blanketed the shorelines of Great St. James. The work will be undertaken by employees of Great St. Jim, LLC and we anticipate that it will be completed in two (2) weeks. We ask that you expedi
8, 2017 Via Hand & Electronic Delivery Dawn L Henry, Esq. Commissioner Department of Planning and Natural Resources 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI 00802 Dawn.FienOtiparrigor Re: Great St. James Sargassum Issue Dear Attorney Henry: On behalf of Gr
graph 7H of the Notice to Cure, were installed prior to Great St. Jim, LLC's acquisition of Great St. James Island and are not maintained or used by Great St. Jim, LLC. The four moorings are affixed to submerged land which is not part of Great St. James Island. That being said, we are happy to assist DPNR by
n on its removal. 7.H. Four moorings in the water. • The four moorings referred to in paragraph 7H of the Notice to Cure, were installed prior to Great St. Jim, LLC's acquisition of Great St. James Island and are not maintained or used by Great St. Jim, LLC. The four moorings are affixed to submerged land w
16, 2016 Via Hand Delivery & Electronic Mail Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2nd Floor St. Thomas, VI 00802 [email protected] Re: Notice to Cure & NOVA-04-16-STT Dear Attorney Baker: I wanted
l apply for the necessary permits required for that purpose, at that time. As stated earlier, this revised Scope is based on joint meetings between Great St. Jim and DPNR's staff to more fully define the short-term and long-term goals for the Cay. The short-term goals 2 Permit Considerations to CZT-05-17(1)
rasitt: December 22. 2016 HONORABLE DAWN HENRY, ESQ. Commissioner, Government of the Virgin Islands Department of Planning and Natural Resources Cyril E. King Airport, Terminal Building - 2nd Floor 8100 Lindberg Bay St. Thomas, U.S. Virgin Islands 00802 THRU: JEAN-PIERRE ORIOL, DIRECTOR OF COASTAL ZONE MANAGEME
e in receipt of the Cease and Desist Notice dated January 14, 2019 and have communicated with our client regarding the same. Please be advised that Great St. Jim is currently undertaking emergency repairs to its septic system which we believe does not require a permit due to exigent circumstances. Great St.
Hand & Electronic Delivery: Mr. Jean-Pierre Oriol Commissioner Department of Planning and Natural Resources Division of Coastal Zone Management Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI 00802 4,44", RECEIVED Jim 2 2 2019 VI CZm P DPNR ROGRAM Re: Cease and Desist Notice dated January 1
otice of Assessment of Civil Penalty, Order for Corrective Action and Notice of Opportunity for Hearing, dated November 4, 2016, and shall work with Great St. Jim, LLC to address DPNR's concerns regarding any and all issues claimed in paragraph seven (7) therein and to promptly cure any and all such issues in
r.com November 7, 2016 Via Electronic Mail < Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI. 00802 Re: NOVA-04-16-STT Dear Attorney Baker: We have reviewed the Notice of Assessment of Civil Pe
l for Great St. Jim, LLC LeRoy V. Smith. Jr., PE, Principal. Joredion Design Group 2 Reconsideration of Specks Condition No. 16 for CZt.O5-17l1) on Greot St. James. St. Thomas !erection Design Group November 29. 2016 EFTA00792793
agers V. 5 Vow:510Am,, 00 Honorable Dawn Henry, Esq. Commissioner, Government of the Virgin Islands Department of Planning and Natural Resources Cyril E. King Airport, Terminal Building - 2nd floor 8100 Lindberg Bay St. Thomas, U.S. Virgin Islands 00802 900 • Pon Onca Soz 6218. Sr. ImamAs, V. S. Via 1 . 16 Id
an opportunity to discuss f=ctual inaccuracies relied upon in the Notice to Cure, which includes the re=oval of moorings that were not installed by Great St. Jim, LLC and were in =xistence prior to the purchase of the island, the demolition of a mov=able beach bar/cabana which DPNR Officer Rosa had notice of
egards, Michele Baker Legal Counsel Division of Coastal Zone Management Department of Planning & Natural Resources 8100 Lindberg Bay, Suite #61 Cyril E. King Airport, 2nd Floor St. Thomas, Virgin Islands 00802 TEL: FAX Confidentiality Notice The information contained in this e-mail Message, including any atta
Entities connected to both Great St. James and Cyril E. King Airport

Jeffrey Epstein
PERSONDaphne Wallace
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Lesley Groff
PERSON
Bella Klein
PERSON
U.S. Virgin Islands
LOCATIONErika Kellerhals
PERSON
Charlotte Amalie
LOCATION
Sarah Ferguson
PERSONDarren Indyke
PERSONGREAT ST
ORGANIZATION
Prince Charles
PERSONFerguson Kroblin
PERSON
San Juan
LOCATIONAnn Rodriquez
PERSONLarry Visoski
PERSON
Jean-Pierre Oriol
PERSON
James Baker
PERSONPoplar, Inc.
ORGANIZATION