the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the route can be laid out to avoid endangered species this may not be necessary. All information should be contained
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Entities connected to both Coastal and Formal Section 7 Consultation

Jeffrey Epstein
PERSONthe Coastal Zone
LOCATION
San Juan
LOCATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONMycetophylla
PERSONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONUSACOE
ORGANIZATION