the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011 Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
Entities connected to both Coastal and Construction Activities & Implementation of Sediment Control

Jeffrey Epstein
PERSONthe Coastal Zone
LOCATION
San Juan
LOCATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONMycetophylla
PERSONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATION