the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the cable lay. I will verify with David Brewer of VISHPO if one will be required and if not I will get a l
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock and the cable lay. I can ask David Brewer of VISHPO if one will be required and
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
ruction procedures. If either NMFS or FWS determine that the project may impact endangered species Formal Section 7 consultation will be required. Archeological surveys may be required for the extension of the dock and the new dock structure, the cable should not require an archeological study since it will
Entities connected to both Coastal and Archeological

Jeffrey Epstein
PERSONthe Coastal Zone
LOCATION
San Juan
LOCATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONMycetophylla
PERSONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATION