4
Shared Docs
4
Same-Page
4 / 4
Mentions
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
id the corals and what measures will be taken during the cable lay to prevent impact to these species. BI0IMPACT, INC. Page 3 EFTA00582901 6.10 Air Quality: The impact on air quality during the cable lay will be discussed 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land and Water
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
step taken to avoid the corals and what measures will be taken during the dock construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
Entities connected to both Coastal and Air Quality

Jeffrey Epstein
PERSONthe Coastal Zone
LOCATION
San Juan
LOCATIONVIWAPA
ORGANIZATIONTerrestrial Resources
ORGANIZATIONHistoric Land
LOCATIONUtilities
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONErika Kellerhals
PERSONThe Lump Sum Cost of
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONPublic Hearings
ORGANIZATIONInteragency Meeting
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATIONUSACOE
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATION
Marc Rich
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION