4
Shared Docs
4
Same-Page
4 / 4
Mentions
repair not yet done yet is asking mike to cancel crane for Thursday.. Richard Kahn HBRK Associates Inc. h Floor Begin forwarded message: From: Bill Hague < Date: July 4, 2018 at X:46:4( :\\1 1.1)f To: Richard Kahn Cc: glidden Subject: Re: Bent rod repair inspection It's not perfect but it's runni
e <1 > wrote: It's a two day job and that's only if nothing goes wrong. Feel free to contact Lee for a first hand explanation of what's involved. Lee Thomas EFTA00917760 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute ins
bject: Barge - Bent rod repair inspection Date: Tue, 03 Jul 2018 00:30:42 +0000 Richard Kahn HBRK Associates Inc. Begin forwarded message: From: Bill Hague Subject: Bent rod repair inspection Date: Jul 2, 2018 at 8:17:48 PM EDT To: " >, "michael glidden" , Rich Kahn Good Evening. Before the 10:00
ion Date: Jul 2, 2018 at 8:17:48 PM EDT To: " >, "michael glidden" , Rich Kahn Good Evening. Before the 10:00 run with Jonny for the container, Lee Thomas is performing a feasibility study to see if the bent rod can be removed and replaced with the engine installed on its ways or in its present place.
ate Date: Tue, 03 Jul 2018 14:50:15 +0000 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor N t Begin forwarded message: From: Bill Hague Subject: Re: Bent rod repair inspection Date: Jul 3, 2018 at 10:20:26 AM EDT To: Cc: Richard Kahn < et >, Ok. Lee said we can likely do the
PM AST To: " , Rich Kahn Subject: Bent rod repair inspection "michael glidden" Good Evening. Before the 10:00 run with Jonny for the container, Lee Thomas is performing a feasibility study to see if the bent rod can be removed and replaced with the engine installed on its ways or in its present place.
t rod repair inspection Richard Kahn HBRK Associates =nc. 575 Lexington =venue, 4th Floor New York, NY =0022 Begin forwarded message: From: =/b>Bill Hague Subject: =/b>Re: Bent rod =epair inspection Date: July 2, 2018 at 9:12:12 PM EDT To: brice gordon Cc: , Richard Kahn Understood. If the repair
gue Date: July 2, 2018 at 8:17:48 PM AST To Subject: Bent rod repair =nspection Good Evening. Before the 10:00 run with Lonny for the =ontainer, Lee Thomas is performing a feasibility study to see if the =ent rod can be removed and replaced with the engine installed on its =ays or in its present place.
Entities connected to both Bill Hague and Lee Thomas