3
Shared Docs
3
Same-Page
3 / 3
Mentions
al Good Morning Anna- I wanted to give you and update on the progress of the Big N. This morning we were ready to lift and install the port engine. Bosco has informed us that the port engine is not ready, he has a few more things he needs to address. I know you were looking into replacing the gear box
em. Attached our a couple of pictures of the corrosion and an estimate to remove and replace both tanks. Please call or email with any questions... Gene Kral Sr. Subbase Drydock, Inc. St. Thomas. USVI 00802 EFTA00710420
und. We charge $45 per pound this includes all labor and material. You have a total of 448LBS to be replaced, so 448lbs x $45= $20,160. In addition Bosco has reviewed the racor fuel filters and they can not be serviced. We will have to replace them for $1000 for both. The batteries on board no longer
d a charge, they will have to be replaced 8 batteries x $152= $1216.... I have attached several photos to show the severity of the wasted plate.... Gene Kral Sr. EFTA00850736
Morni=g Anna- =/div> = wanted to give you and update on the progress of the Big N. This morning w= were ready to lift and install the port engine. Bosco has informed us that=the port engine is not ready, he has a few more things he needs to address.=I know you were looking into replacing the gear box
em. Attached our a cou=le of pictures of the corrosion and an estimate to remove and replace both t=nks. Please call or email with any questions... Gene Kral Sr. Subbase Drydock, Inc. Parcel 16=, Subbase 2 EFTA_R1_02145631 EFTA02715256
Entities connected to both Bosco and Gene Kral Sr.

Jeffrey Epstein
PERSON
Richard Kahn
PERSONAnn Rodriquez
PERSON
Marc Rich
PERSONDaphne Wallace
PERSONSubbase
ORGANIZATION
Alfredo Rodriguez
PERSONDebra Lowry
PERSONIsland Rigging
ORGANIZATION