4
Shared Docs
4
Same-Page
4 / 4
Mentions
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have revised leaving out the new additional dock. I fed that this is an excellent decision. Tryin
tion 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have listed each item separately and provide a discussion of how I feel we should best approach t
encies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
Entities connected to both Bioimpact, Inc. and Federal Fish and Wildlife Service
Amy Claire Dempsey
PERSON
Jeffrey Epstein
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSON
Paul Ryan
PERSONVIWAPA
ORGANIZATION
Bill Clinton
PERSONRyan Wisehart
PERSON
San Juan
LOCATIONFormal Section 7 Consultation
ORGANIZATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONPublic Hearings
ORGANIZATION