to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
y well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have revised leaving out the new additional dock. I fed that this is an excellent decision. Tryin
e able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have listed each item separately and provide a discussion of how I feel we should best approach t
o engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
Entities connected to both Bioimpact, Inc. and U.S. Army Corps
Amy Claire Dempsey
PERSON
Jeffrey Epstein
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSON
Paul Ryan
PERSONVIWAPA
ORGANIZATION
Bill Clinton
PERSONRyan Wisehart
PERSON
San Juan
LOCATIONFormal Section 7 Consultation
ORGANIZATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATIONAcroporapalmata
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONPublic Hearings
ORGANIZATION