4
Shared Docs
4
Same-Page
4 / 4
Mentions
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
id the corals and what measures will be taken during the cable lay to prevent impact to these species. BI0IMPACT, INC. Page 3 EFTA00582901 6.10 Air Quality: The impact on air quality during the cable lay will be discussed 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land and Water
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have revised leaving out the new additional dock. I fed that this is an excellent decision. Tryin
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
to avoid the corals and what measures will be taken during the dock extension construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have listed each item separately and provide a discussion of how I feel we should best approach t
step taken to avoid the corals and what measures will be taken during the dock construction and cable lay to prevent impact to these species. 6.10 Air Quality: The impact on air quality during the cable lay and dock will be discussed. 7.00 Impact of Proposed Modification on the Human Environment 7.01 Land
Entities connected to both Bioimpact, Inc. and Air Quality

Jeffrey Epstein
PERSONAmy Claire Dempsey
PERSON
St. Croix
LOCATION
U.S. Virgin Islands
LOCATIONErika Kellerhals
PERSON
Marc Rich
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSONVIWAPA
ORGANIZATION
Paul Ryan
PERSON
Bill Clinton
PERSON
Tortola
LOCATIONUSACE
ORGANIZATIONChristmas Cove
LOCATIONRyan Wisehart
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATION