4
Shared Docs
4
Same-Page
4 / 4
Mentions
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the cable landing, path and the i
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have revised leaving out the new additional dock. I fed that this is an excellent decision. Tryin
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
s Ferguson Kroblin PLLC 9100 Port of Sale Mall Suite 15 St. Thomas, VI 00802 Re: Great St. James Permitting Dear Erika, Thank you for contacting Bioimpact, Inc. in regard to the permitting for Great St. James. I have listed each item separately and provide a discussion of how I feel we should best approach t
Both FWS and NMFS require that we state in the application what sea conditions we will construct and when the construction will be postponed. 6.02 Landforms, Geology, Soils, and Historic Land Use: Bioimpact describe the geology and sediments of the proposed locations and their impact on the project and the impact of the
Entities connected to both Bioimpact, Inc. and Landforms, Geology, Soils
Amy Claire Dempsey
PERSON
Jeffrey Epstein
PERSON
St. Croix
LOCATION
U.S. Virgin Islands
LOCATIONErika Kellerhals
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSONVIWAPA
ORGANIZATION
Paul Ryan
PERSON
Bill Clinton
PERSON
Tortola
LOCATIONUSACE
ORGANIZATIONChristmas Cove
LOCATIONUtilities
ORGANIZATIONRyan Wisehart
PERSONAir Quality
ORGANIZATION
San Juan
LOCATIONTerrestrial Resources
ORGANIZATIONHistoric Land
LOCATIONthe Coastal Zone
LOCATION