3
Shared Docs
3
Same-Page
3 / 3
Mentions
e covered..C240 Pool department: More chlorine tablet=, algaecide, and a very large order of the pool salt. We will also put tog.ther an order with Luli Pools. Mari=e department: So far, (6) dock boxes - 6' by 3' in white, (4) dock=ladders, 7 steps per ladder. I will send Carlos&#=9; additional items and
not be visible to the eye that the carpet came from 2 d=e lots when it is installed. We are comfortable to move forward =ith the carpet in stock at the Floor Factory, but if you would prefer to o=tain carpet from one consist roll, we will need 290 square yards per the m=asurements submitted by the installer for
ed are covered. Pool depar=ment: More chlorine tablets, algaecide, and a very large order of the pool=salt. We will also put together an order with Luli Pools. Electrical department: Renato is purchasing th= 3 types of receptacles, 3 types of receptacle covers, and 2 types of swit=hes needed. Danny requ
not be visible to the eye th=t the carpet came from 2 dye lots when it is installed. We are c=mfortable to move forward with the carpet in stock at the Floor Factory, b=t if you would prefer to obtain carpet from one consist roll, we will need=290 square yards per the measurements submitted by the installer for t
ed are covered. Pool depar=ment: More chlorine tablets, algaecide, and a very large order of the pool s=lt. We will also put together an order with Luli Pools. <=div> Electrical department: Renato is purchasing the 3 t=pes of receptacles, 3 types of receptacle covers, and 2 types of switches n=eded. Danny
not be visible to the eye that the carpet came from 2 dye lots when it is i=stalled. We are comfortable to move forward with the carpet in st=ck at the Floor Factory, but if you would prefer to obtain carpet from one c=nsist roll, we will need 290 square yards per the measurements submitted by=the installer for t
Entities connected to both Luli Pools and the Floor Factory