4
Shared Docs
4
Same-Page
4 / 4
Mentions
t on each side of the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
ded to skin the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Pag
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
n the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
ester & James Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Bench and Tropical Shipping STT

Jeffrey Epstein
PERSON
Julie K. Brown
PERSONLeon Black
PERSON
Joi Ito
PERSON
Robert Gates
PERSON
Samantha Power
PERSONLighting & Electrical
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATION
Oliver Stone
PERSONFranks Electric
ORGANIZATIONNC Unit
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATIONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Palm Beach
LOCATIONClutch
ORGANIZATIONTrenching Area & Description
ORGANIZATIONPanels
ORGANIZATIONAllied
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATION