t on each side of the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
ded to skin the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Pag
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
n the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
ester & James Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both Bench and Christmas Cove Service Dock

Jeffrey Epstein
PERSON
Julie K. Brown
PERSONLeon Black
PERSON
Joi Ito
PERSON
Robert Gates
PERSON
Samantha Power
PERSONLighting & Electrical
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATION
Oliver Stone
PERSONFranks Electric
ORGANIZATIONNC Unit
ORGANIZATIONTropical Shipping STT
ORGANIZATIONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Palm Beach
LOCATIONClutch
ORGANIZATIONTrenching Area & Description
ORGANIZATIONPanels
ORGANIZATIONAllied
ORGANIZATIONBlue Ocean Tackle Inc.