t on each side of the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida
ry, I don't have an answer as yet" He's waiting on Bobby & Boddy's Contractor to give him answers on the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 10th-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/18/19. Fiberglass modifications
ded to skin the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Pag
weather. Per 5 " I'm sorry, I don't have an answer as yet" He waiting on ..ontractor to give him answers on the hydraulic. e wi i con inue o call Barge arrival home could be between June 10th-15th Take Nana to Offshore to get tie Engines Checked Nautica delivered 5/18/19. Fiberglass modifications
n the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18
r. Per 6/5 " sorry, I don't have an answer as yet" He's waiting on Contractor to give him answers on the hydraulic. e wr will con inue to call Barge anival home could be between June 10th-15th Take. to Offshore to get the Engines Checked Nautica delivered 918/19. Fiberglass modifications in pr
ester & James Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5
ry, I don't have an answer as yet* He's waiting on Bobby & Boddy's Contractor to give him answers on the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 100-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/16/19. Fiberglass modifications i
Entities connected to both Bench and Barge

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONDaphne Wallace
PERSON
Carlos
PERSON
Condoleezza Rice
PERSON
Oliver Stone
PERSON
Samantha Power
PERSONLeon Black
PERSON
Ghislaine Maxwell
PERSONKaren
PERSONDarren Indyke
PERSON
Cabana
LOCATIONLarry Visoski
PERSON
Robert Gates
PERSON
Saint James
LOCATIONTiki Hut
ORGANIZATION
Julie K. Brown
PERSON
Wilbur Ross
PERSONDupson
ORGANIZATION