3
Shared Docs
3
Same-Page
3 / 3
Mentions
tall small ones that are on site 36. Floating Dock — fabrication of metal beam to commence 3/6 37. Remove Rusty metal dock Columns — recovered 38. Midnight Express — new trailer to be purchased 39. Sundial — pour on 3/7 — Tom to confirm this date 40. Big Wind Door— need to be unstuck EFTA00583476
th 3. Five Palms — stucco, window, hardscape, electrical - solar estimate Mar 9th - Floor - Doors location and fabrication -Lighting schedule 4. Grotto - JE to redo layout of steps, determine shelter height — roof for Grotto shed 5. Heli garage —final punch out (painting) 6. Heli road - extend 7. Hanga
tall small ones that are on site 36. Floating Dock — fabrication of metal beam to commence 3/6 37. Remove Rusty metal dock Columns — recovered 38. Midnight Express — new trailer to be purchased EFTA00583475
ath and cabana — slipcovers for sofa and cushion week of the 27th 3. Five Palms — stucco, window, hardscape, electrical - solar estimate Mar 9th 4. Grotto - JE to redo layout of steps, determine shelter height 5. Heli garage —final punch out (painting) 6. Hangar —floor sanding in progress — 401(50' area fo
that are on site 36. Floating Dock — fabrication of metal beam to commence 3/6 EFTA00583639 37. Remove Rusty metal dock Columns — recovered 38. Midnight Express — new trailer to be purchased 39. Sundial — pour on 3/7 — Tom to confirm this date 40. Big Wind Door — need to be unstuck 41. Sod EFTA00583640
timate Mar 9th - Floor - Doors location and fabrication -Lighting schedule - Electricity to run to Five Palms — Brice - what are our options? 4. Grotto - JE to redo layout of steps, determine shelter height — roof for Grotto shed 5. Heli garage — final punch out (painting) 6. Heli road - extend 7. Hang
Entities connected to both Midnight Express and Grotto - JE