o On Thu, Apr 12, 2018 at 3:55 PM, Amy Dempsey < > wrote: Army Corps called late this morning and said that enforcement has decided to hold up the VIWAPA cable project because of the LSJ non-compliance issues. Army Corps suggested that we removed the LSJ-GSJ cable so the cable system can move ahead.
e barge ramps out and pull the fill material back out around the wetland near the point closest to LSJ. I am waiting on old wetland delineation from Ryan Wisehart so I can mark it and we can get the material moved back a couple of feet and plant a few mangroves. Jonathon suggest that if you really want one of
ago On Thu, Apr 12, 2018 at 3:55 PM, Amy Dempsey - wrote: Army Corps called late this morning and said that enforcement has decided to hold up the VIWAPA cable project because of the LSJ non-compliance issues. Army Corps suggested that we removed the LSJ-GSJ cable so the cable system can move ahead.
e barge ramps out and pull the fill material back out around the wetland near the point closest to LSJ. I am waiting on old wetland delineation from Ryan Wisehart so I can mark it and we can get the material moved back a couple of feet and plant a few mangroves. Jonathon suggest that if you really want one of
at regard. We are going to check one final potential route this week and will be making a decision on what route will be pursued after meeting with VIWAPA and discussion with Mr. Epstein. Cables have a small footprint and I am making sure we stay away from ESA corals to the greatest extent possible. B
profile drawing as well as site plan drawings. These drawings will need to be provided by a designing engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to have VIWAPA to provide the engineering portions we need. 5.03 Project Workplan: A detailed discussion of th
ll be required to monitor the cable for the first several years to look at impact. I spoke to Clinton Hedrington and told him it was imperative that VIWAPA immediately get in compliance with their cable monitoring so it does not impact us on this permitting. With this short of a run I know we can find
works so this is something you should consider. Dock Maintenance I'll need an as-built of the dock which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide the details of the intake. We will file for a minor modification and maintenance for the dock with both CZM an
we will be required to monitor the cable for the first several years to look at impact. I know you were reaching out to Julio Rhymer, we should let VIWAPA take the lead as the applicant for the cable permit since they can make to argument that the cable would also service other future residents if the
pplication and follow it through with Verni11 Roberts at DEP $3500.00 Preliminary Site Assessment Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish the new dock location, cable route and the landing site. Based on the size of the project foot print, we esti
Entities connected to both VIWAPA and Ryan Wisehart

Jeffrey Epstein
PERSON
Paul Ryan
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
St. Croix
LOCATIONErika Kellerhals
PERSON
Sarah Ferguson
PERSONKingshill
LOCATION
San Juan
LOCATIONFerguson Kroblin
PERSONTerrestrial Resources
ORGANIZATIONUtilities
ORGANIZATIONHistoric Land
LOCATIONAir Quality
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONthe Coastal Zone
LOCATIONArcheological
ORGANIZATION
Coastal
LOCATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATION