5
Shared Docs
5
Same-Page
5 / 5
Mentions
NYC ( $800 per day per Tech ) Travel $3,360.80 This is 2 round Trip tickets to NYC and 4 Round Trips to LSJ Housing for LSJ will be at Emad's Housing for NYC Will be at 301 Al Freight will be provided via Emad. Equipment Labor Total LSJ Theater 5102.275.03 LSJ Master $10.605.00 LSJ Gym $16,522.00
0.00 $85,000.00 582,500.004, I ea Sunfire Preamp 401 Preamp w HDMI Switching 2 ea Sunfire Amp 7401 7 Channel 400 watt per channel 1 ea Crestron CP2E Processor 1 ea Apple AppleTV Apple TV 1 ea Apple Ipad lead 1 ea Apple Mac Mini Main Hard Drive 2.4 GHz 320 gig 1 ea Apple Cres
ated Travel $3,360.80 This is 2 round Trip tickets to NYC and 4 Round Trips to LSJ Project Total $227,226.80 Housing for LSJ will be at Emad's Housing for NYC will be at 301 All Freight will be provided via Emad. Equipment Labor Total LSJ Theater $89.275.00 $3200.00 $92.475.00 LSJ Master $10.605.0
or 1 ea Monster ProPower 3600 Power Conditioner 1 ea Snap Av SM-Rack-12u Electronic Rack Enclosure 1 ea Petra D/A Analog Audio 1 ea Crestron Program Ipad Program 2 ea Sound X Labor 2 Technitions ' please note that it will take 4 weeks from the date of ordering to obtain the EN Sp
NYC ( $800 per day per Tech ) Travel $3,360.80 This is 2 round Trip tickets to NYC and 4 Round Trips to LSJ Housing for LSJ will be at Emad's Housing for NYC will be at 301 All Freight will be provided via Emad. Equipment Labor Total LSJ Theater $102,275.00 $3200.00 $105.475.00 LSJ Master $10.605
y 500' spool 12 gauge 4 conductor 1 ea Monster ProPower 3600 Power Conditioner 1 ea Snap Av SM-Rack-12u Electronic Rack Enclosure 1 ea Crestron Program Ipad Program 2 ea Sound X Labor 2 Technitions ' please note that it will take 4 weeks from the date of ordering to obtain the EN Sp
ated Travel $3,360.80 This is 2 round Trip tickets to NYC and 4 Round Trips to LSJ Project Total $227,226.80 Housing for LSJ will be at Emad's Housing for NYC will be at 301 All Freight will be provided via Emad. Equipment Labor Total LSJ Theater 589.275.00 $3200.00 $92.475.00 LSJ Master 510.605.0
tor 1 ea Monster ProPower 3600 Power Conditioner 1 ea Snap Av SM-Radc-12u Electronic Rack Enclosure 1 ea Petra DA Analog Audio 1 ea Crestron Program Ipad Program 2 ea Sound X Labor 2 Technitions ' please note that it will take 4 weeks from the date of ordering to obtain the EN Sp
ated Travel $3,360.80 This is 2 round Trip tickets to NYC and 4 Round Trips to LSJ Project Total $209,186.80 Housing for LSJ will be at Emad's Housing for NYC will be at 301 All Freight will be provided via Emad. Equipment Labor Total LSJ Theater S80.700.00 $3200.00 $83900.00 LSJ Master 59.865.00
or 1 ea Monster ProPower 3600 Power Conditioner 1 ea Snap Av SM-Rack-12u Electronic Rack Enclosure 1 ea Petra D/A Analog Audio 1 ea Crestron Program Ipad Program 2 ea Sound X Labor 2 Technitions * please note that it will take 4 weeks from the date of ordering to obtain the EV Sp
Entities connected to both Housing for NYC and Crestron

Jeffrey Epstein
PERSON
Samantha Power
PERSONTheater
ORGANIZATIONIpad Program
ORGANIZATIONPeerless
ORGANIZATIONAudio Control
ORGANIZATIONXLR Cables
ORGANIZATIONDigital Audio
ORGANIZATIONMarine Entertainment
ORGANIZATIONWindy City
LOCATIONHDMI Cable
ORGANIZATIONInterconects
ORGANIZATIONEtherial
ORGANIZATIONDigital Projection
ORGANIZATIONWEST NORTHWEST HIGHWAY
LOCATIONHDMI Baulin
ORGANIZATIONTechnitions
ORGANIZATIONOualia
LOCATIONFrieght
ORGANIZATIONKlipsch
ORGANIZATION