4
Shared Docs
4
Same-Page
4 / 4
Mentions
Timing Production will take 3 weeks and then another I week for shipping Projected arrival on STT is July 20 Installation Carlos said that with Ramon and Hernando installation will take approximately 1 week Projected Costs Options 1-3 (three rows of fenders) Color - Dark Grey # 11181 Vendor Hole
current layout Options 1-3 are three rows of 6' fenders Carlos measured to cover entire dock we would need 693 feet which comes to 116 (6' pieces) Options 4 & 5 are two rows of 6' fenders Carlos measured to cover entire dock we would need 462 feet which comes to 77 (6' pieces) Note 500 feet is minimum order
Timing Production will take 3 weeks and then another 1 week for shipping Projected arrival on STT is July 20 Installation Carlos said that with Ramon and Hernando installation will take approximately 1 week Projected Costs Options 1-3 (three rows of fenders) Color - Dark Grey # 11181 13.44 x 693
current layout Options 1-3 are three rows of 6' fenders Carlos measured to cover entire dock we would need 693 feet which comes to 116 (6' pieces) Options 4 & 5 are two rows of 6' fenders Carlos measured to cover entire dock we would need 462 feet which comes to 77 (6' pieces) Note 500 feet is minimum order
Timing Production will take 3 weeks and then =nother 1 week for shipping Projected arrival on SIT is Jul= 20 Installation C=rlos said that with Ramon and Hernando installation will take approximatel= 1 week 9,314.92 4,176.00 3,024.00 Projected Costs<=b> Options 1-3 (three rows of fenders) Colo
e three rows of 6' fenders <=iv>Carlos measured to cover entire dock we would need 693 feet which comes=to 116 (6' EFTA_R1_01620552 EFTA02496176 Options 4 & 5 are =wo rows of 6' fenders Carlos measured to cover entire do=k we would need 462 feet which comes to 77 (6' pieces) <=>Note 500 feet is minimum or
2497147 Product=on will take 3 weeks and then another 1 week for shipping =rojected arrival on STT is July 20 Installation Carlos said that with Ramon and Hernando inst=llation will take approximately 1 week = 9,314.92 348.004 piece x 1=.00) 4,176.00 50= feet = 6,720.00 </=iv> x 12.00) 3,02=
e rows =f 6' fenders Carlos measured to cover entire dock we wou=d need 693 feet which comes to 116 (6' pieces) 77 (6=E244 pieces) configuration Options 4 & 5 are two rows of 6' fenders Carlos=measured to cover entire dock we would need 462 feet which comes to Note 500 feet is minimum order therefore we =
Entities connected to both Ramon Alonso Ocejo and Options 4 & 5

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Carlos
PERSONFront Hole
ORGANIZATIONDock Fenders
PERSONOption A - Screws
ORGANIZATIONStainless Steel Threaded Rods & Bolts
ORGANIZATIONLexington
LOCATION