s Sir, September 11 photos for your review and comments: MBR flooring - sanding #3 completed and epoxy applied - Pokey on site 9/13 for sanding #4 Pebble Beach - clean up continues - Danny received your directive for a smooth finish - he is to calculate the amount of yards of concrete needed and get a quote
Stone wall along road to Info Center - in progress Waterfall cistern - slab poured today - block laying on 9/14 Gym A/C shed - painting completed Dining Terrace ceiling fans changed out from the rusty ones Fuel Depots - RanVar came out to calibrate the fuel depots and uncovered severe rusting and 4 leaks - 3
s Sir, September 11 photos for your review and comments: MBR flooring - sanding #3 completed and epoxy applied - Pokey on site 9/13 for sanding #4 Pebble Beach - clean up continues - Danny received your directive for a smooth finish - he is to calculate the amount of yards of concrete needed and get a quote
Stone wall along road to Info Center - in progress Waterfall cistern - slab poured today - block laying on 9/14 Gym A/C shed - painting completed Dining Terrace ceiling fans changed out from the rusty ones Fuel Depots - RanVar came out to calibrate the fuel depots and uncovered severe rusting and 4 leaks - 3
oring_(2).JPG; MBR_flooring_(3).JPG; MBR_flooring_(4).JPG; MBR_flooring_(5).JPG; MBR_flooring_(6).JPG; MBR_flooring_(7).JPG; Pebble_Beach_(1).JPG; Pebble Beach (2).JPG; Pebble Beach (3).JPG; Pebble Beach (4).JPG; _ _ _ _ _ _ Pebble Beach_ (5).JPG; Pebble Beach_ (6).JPG; Pebble_Beach_(7).JPG; _ _ Pe
Stone wall along road to Info Center - in progress Waterfall cistern - slab poured today - block laying on 9/14 Gym A/C shed - painting completed Dining Terrace ceiling fans changed out from the rusty ones Fuel Depots - RanVar came out to calibrate the fuel depots and uncovered severe rusting and 4 leaks - 3
Entities connected to both Pebble Beach and Dining Terrace